23,000 sq.ft of offered area, 7.5 ft clear height, 3 docks. Available now and listed in our network. of warehouse space is listed in Haridwar, Uttarakhand. The listing is available now.
What this building carries today is listed below. The operations it supports at 23,000 sq.ft. in Haridwar — receiving, putaway, pick and pack, labelling, kitting and dispatch — are scoped at enquiry against your requirement.
the roof clears 75 ft at the eave and rises to 85 ft in the middle of the span, and 3 loading bays sit on this shed — enough for simultaneous receiving and dispatch.
Fire protection on this building is Fire NOC with hydrant and sprinklers. That certificate decides insurance and stacking limits, so ask for a copy before you sign.
Offered area: 23,000 sq.ft.
Clear height: 7.5 ft.
Centre height: 8.5 ft.
Docks: 3.
Plinth height: 4 ft.
Flooring: Trimix flooring.
Structure: PEB Shed Skylight Available.
Fire protection: Fire NOC with hydrant and sprinklers.
Possession: Immediate.
Who it suits. If your requirement is 23,000 sq.ft. sq ft in Haridwar with truck access and 75 ft of clear height, this shed matches without waiting on civil work.
What to check at the site visit. On the visit, check the 3 docks against your peak vehicle flow, the Trimix flooring. floor against your racking loads, the yard turn for a 40-foot trailer and the current fire paperwork — those four points decide more than any brochure figure.
How to enquire. Share the area, the start date and what you store, and we will book the Haridwar site visit and send the written terms.
Frequently asked questions
How much of this warehouse is on offer? 23,000 sq.ft. is offered at Haridwar, Uttarakhand.
How high is the roof at the eave? 75 ft clear, 85 ft at centre.
How many docks serve this building? 3.
What is the flooring specification? Trimix flooring..
What fire-safety setup does the building have? Yes. The building carries a Fire NOC with hydrant and sprinklers.
Can we arrange a site visit? Yes. Send the area and start date, and a visit is arranged.
When can possession start? Ask for the handover date in writing in the offer letter.