10,000 Sq.ft of offered area, 2 docks. Available now and listed in our network. of warehouse space is listed in Danapur, Patna, Bihar. The listing is available now.
What this building carries today is listed below. The operations it supports at 10,000 Sq.ft. in Patna — receiving, putaway, pick and pack, labelling, kitting and dispatch — are scoped at enquiry against your requirement.
Height and floor decide what you can actually store before anything else does. Ask for the measured clear height at the site visit, measured under the knee rather than at the ridge. The shed carries 2 loading docks, which sets how many vehicles can turn around at peak.
Fire protection on this building is Fire NOC with hydrant and sprinklers. Insurance and what you can store at height follow from it — get a copy with the offer letter.
Offered area: 10,000 Sq.ft.
Centre height: 30 ft.
Docks: 2.
Flooring: RCC Cemented Fire NO.
Fire protection: Fire NOC with hydrant and sprinklers.
Possession: Immediate.
Who it suits. 3PL operators, distributors, e-commerce sellers and manufacturers who need 10,000 Sq.ft in Patna with truck access, fire protection and a site they can start working in, and who would rather deal with the operator than a broker.
What to check at the site visit. Four checks carry the visit: 2 docks against your peak arrivals, the RCC Cemented Fire NO. floor under your loads, a 40-foot trailer's yard turn, and the fire certificate dates.
How to enquire. Send your requirement — area, start date and stock profile — and the Patna team will arrange the visit and quote terms in writing.
Frequently asked questions
How much of this shed is available? 10,000 Sq.ft. is offered at .
How tall is the roof inside? ft clear, 30 ft at centre.
How many loading bays does the shed have? 2.
What is the flooring specification? RCC Cemented Fire NO..
What fire-safety setup does the building have? Yes. The building carries a Fire NOC with hydrant and sprinklers.
Can we arrange a site visit? Yes. Send the area and start date, and a visit is arranged.
When can possession start? Ask for the handover date in writing in the offer letter.