Heavy Equipment Warehousing in Delhi NCR: Hardstand, Cover and Project Cargo (2026 Guide)

Lozy shed row in Chennai - metal-clad roof over roller doors with a wide concrete apron in front

Heavy equipment warehousing is storage for cargo that cannot be racked, stacked or lifted by hand: a fabricated frame, a crated machine, a drive skid with its panel still bolted on. Heavy equipment warehousing with Lozy settles three things before an item moves - the ground it will stand on, the cover it waits under, and the route a loaded trailer needs to reach it when the site is ready. Space starts at ₹12 per sq ft per month, billed monthly with no long lock-in.

Key takeaways

  • Lozy runs 77+ warehouses and more than a million square feet of live space, with heavy equipment positions in the Faridabad industrial estates, on the Manesar side of Gurugram and on the Dadri and Bisnoli belt of Greater Noida.
  • Industrial space starts at ₹12 per sq ft per month, on-demand space at ₹14 and a long-term hold from ₹1,199 per month, billed monthly with no lock-in.
  • An out-of-gauge item is placed on the route it will leave by, so the same trailer can still back up to that spot after a wet season has crossed the yard.
  • Every long-wait unit needs three things kept together: its position, its condition at intake, and the project release it belongs to.
Fabricated framesout-of-gauge Crated machinesno stacking Drive skidsfloor bay Control panelscovered Pipes and sectionslong load Project spareskitted
FABRICATORSTORAGE POSITIONSITE GATE
77+warehouses
1M+sq ft live space
₹12per sq ft / month

A store of this kind is judged twice: on the day a unit lands and on the day it comes out again. Nothing visible happens between those days, which is why the failures stay quiet - a frame on bare soil, a crate a forklift cannot get its forks under, a machine parked behind two others that will not move this year.

Below is the operational detail behind Lozy's industrial and bulk warehousing for project cargo: how a unit is received and placed, how a hardstand differs from a covered shed, why the storage position is a transport decision, and how commissioning sets the term. Capital-goods context comes from IBEF's engineering profile and the Ministry of Heavy Industries.

How project cargo actually moves through a heavy equipment warehouse

The pieces are few, heavy and individually priced, and the work runs as four movements.

Arrival day is a measured operation

A crated machine or a fabricated frame arrives on a trailer or low-bed and is measured before it is lifted: dimensions against the drawing, weight against the packing list, crating inspected, and the stencilled project reference checked against the advice note. Where the numbers disagree, the item is set down on the apron and photographed rather than pushed into position. Long or awkward pieces come off with the carrier's crane, so the trailer has to stand on ground that takes its axle load while the boom works.

Then it stands where it can leave again

A unit takes a ground-floor bay sized to its footprint plus the room a forklift or crane needs to pick it cleanly, and nothing is stacked on top however flat the crate looks. Skids stay square, the fabricator's bracing stays on, and the spot is registered as an address: building, bay and project reference. Inspection and pre-dispatch visits should not need half the building shifted first.

Release follows the site's build order

The site issues a release list; items are checked against it with their spares, panels and manuals, bracing is refitted, stencils confirmed, and the load leaves with papers matching the register line. One building can hold foundation material for one work package beside fit-out items for another, and the release list is what stops the two being confused at the gate.

Hardstand or covered shed: choosing the ground in a heavy equipment warehouse

Most of an enquiry is settled by one question: can this item stand in the open, or does it have to be indoors? Both answers exist on a proper heavy equipment site, and choosing wrongly is expensive in two currencies - rust on one side, unworkable access on the other. The service itself is described on the heavy equipment and project cargo warehousing page.

When a hardstand is the right answer

An open paved apron suits what weather cannot hurt: painted or galvanised steel, bare concrete elements, cast and heavy fabrications, crane mats and anything already in weatherproof packing. A hardstand offers room a shed cannot - a low-bed backs alongside, a crane sets up on its outriggers, and a twenty-metre section lies flat with no door width to negotiate. Machined faces, unpainted steel and anything electrical do not belong in the open here, where dust moves with the wind and the monsoon arrives with sideways rain.

When a covered shed earns its cost

A covered position is the default for crated machines, control panels, drive units, instruments, primed or unpainted steel, and anything whose damage claim would open with a labour quote rather than a transport charge. Check the dimension envelope rather than the floor area: door width and clear height against the unit plus its skid and lifting gear, headroom under the truss for a hook, and a position beneath a solid roof line instead of at the edge of a leak path.

Floor load, point load, and what the slab can carry

A machine does not spread its weight like a pallet of cartons: it transfers load through four skids, jacking points or outrigger pads, so the figure that matters is the point load under each contact, not the building's average. Ask what the apron or slab is rated for and how it behaved in the last monsoon - a hardstand that rutted under a loaded tipper will not take the same rear axle twice. Spread what can be spread: dunnage, steel plates and pads under skids cost far less than a cracked apron.

Crane, forklift and the loaded trailer

The handling plan names the machine before arrival day. A heavy forklift or telescopic handler lifts what it can reach with a clear mast; anything longer or more delicate wants a mobile crane or the carrier's boom, and each has its own demands - outrigger pads on firm ground, a working radius that does not cross a shed wall, tail swing at the rear. LT lines across a yard, a tree canopy over a gate and a roller-door lintel have each turned an easy lift into half a day. The trunk roads a project store usually sits on, NH-48 and NH-44, are maintained by the National Highways Authority of India.

Why the storage position is a transport decision

The failure that surfaces in August

An item arrives in the dry months and is placed neatly at the back of a yard, past two other consignments, on what looks like the firmest patch. Three quarters later the site sends a release and the picture has changed: the connecting strip has lost its surface, the boundary drain is silted, standing water sits within a metre of the skids, and the low-bed that has to lift the unit cannot get closer than the gate. The job is now rigging on soft ground rather than loading on a hardstand - a second crane call, a wait for a dry week and, at worst, a move to a temporary spot that costs more than a year of the space it was meant to save.

Design the route backwards from the loaded trailer

Choose the exit position first and let the layout follow. Pick the spot from which the largest vehicle that will ever lift the item can load it, keep that approach swept and surfaced for the whole term, and use the strip in front of it rather than filling it. Design for the vehicle you dislike: a 40-foot trailer with a tail-swing problem, a low-bed and its ramp geometry, a trailer-mounted crane that needs a level base. Gate width, turning radius and apron gradient belong in the same conversation as the rent. Put it in writing at onboarding - the position and its fallback, the load-out vehicle, the route through the site, the pre-monsoon ground check, and who confirms the route is clear on the day.

Protecting and documenting a high-value unit

Cover that keeps rain and dust off

Covers stay on, but loose enough to let air move: sheeting wrapped tight over cold steel traps condensation and does more damage than the dust it was meant to stop. Machined faces keep a protective film, panels and instruments keep transit wrapping and a sealed cover of their own, and crates are rechecked after every movement rather than once at intake. Where an item is bare by nature - a fabricated frame, a stanchion - the answer is its position rather than its covering.

Off the floor and out of the leak path

Nothing heavy sits directly on a shed floor for months. Timber or concrete pads lift the unit clear of the slab, letting air pass underneath and keeping the base out of the water that gathers after a heavy spell. Positions avoid the predictable wet spots: under gutter lines, beside roller doors where rain drives in, along exposed roof edges, and the low corner of a yard that drains towards it. Plinth height and the way an apron sheds water are part of the protection plan, not housekeeping.

The register line for one machine

A single item deserves a line as detailed as a whole consignment: the unit's reference, its project, the position it occupies, a count of every piece that arrived with it - machine, skids, crate, panel, spares box, manuals and the drawings file - and the condition observed at intake. Photographs taken in position after unloading are the honest baseline for any later question about a dent or a missing bracket. The count is what settles arguments, because it is almost never the machine that goes missing; it is the mounting bolts, the key or the drawing set.

Evidence at intake, evidence at release

At release the item is checked against that same description and the papers travel with the load: dispatch note, register page and gate pass, all matching. On a unit worth more than a year's rent for the building holding it, this is what a warranty claim, an insurer's query or a site handover dispute is settled on - minutes to keep while it is worth weeks to reconstruct.

How the commissioning calendar sets your storage term and your bill

What actually sets the term

Three clocks run at once on a project. Civil work and foundation approvals move first, the structural and fit-out sequence follows, and only then arrives the installation window that needs the machine on site. Equipment is bought against the fast clock and installed against the slow one, so the gap between delivery and installation is measured in months. In NCR that gap has its own seasons: the monsoon slows site work and softens yards between June and September, and the infrastructure cycle pushes awards and releases around the fiscal year, with a March-end dispatch rush on capital-funded programmes. Programme and tender announcements come through the Press Information Bureau. Storage planned month by month absorbs all of it; storage planned against a fixed period turns every slip into a renegotiation.

Extensions, partial release and the space in between

Two habits make a long wait cheap to manage. Take the space month by month, so an extension is a note rather than a fresh contract, and release in stages - the spares cabinet, the second crate, the panels - instead of holding everything until the last item is called. When a site date moves out, a monthly term simply continues; when it pulls forward, the release list is worked item by item. A project that has shipped half its consignment has also freed floor area that should come off the bill rather than sit as a monument to a finished work package.

The published bases you can start from

The heavy equipment warehousing requirement usually lands on one of these published bases:

  • Industrial and bulk space - from ₹12 per sq ft per month on the industrial warehousing at Lozy page, priced by floor area: the basis for out-of-gauge items in ground bays.
  • Godown and warehouse space for rent - from ₹12 per sq ft per month on the warehouse for rent page, for a self-contained area or a covered shed row rather than a managed bay.
  • On-demand space - from ₹14 per sq ft per month on the on-demand warehouse space page, for a surge consignment or the gap between two project phases.
  • Long-term storage - from ₹1,199 per month on the long-term warehousing page, for a machine waiting out a full commissioning cycle.
  • Inventory-led storage - a running ledger of what is held and where it stands, on the inventory warehousing services page.
  • Commercial and godown space - the commercial warehousing page, where a project package shares a building with other trade.

All are starting rates, billed monthly and invoiced with GST, with no long lock-in, and none is a quote - the final figure depends on what your items occupy. Warehouse rent attracts GST, and a registered business can claim input credit when the invoice is raised as a tax invoice in its own name; the rules are published on the GST portal. The practice the trade works to is described by the Warehousing Development and Regulatory Authority.

What moves the number on project cargo

  • Footprint, not weight. A machine is billed on the floor it occupies including its working space, and an awkward shape can use twice the area of a neat one.
  • Cover. A shed position costs more than an open apron at the same location, and that is a materials question: what happens to the item if it is rained on for one season.
  • Handling intensity. A crane call for every move, a rearrangement to reach one unit or a re-handling after a wet spell all appear in the quote; a unit placed once does not.
  • Location. Land beside the project site and land two expressways away are different assets, and the gap shows in the monthly rate.
  • Term and basis. Monthly, long-term and on-demand price differently, and a project that knows its likely span gets a better overall cost than one booking a week at a time.

Own godown, shared heavy equipment warehouse or a project 3PL

These three routes differ less on price than on who carries the risk when a site date moves. To have the ground check run with you, the heavy equipment warehousing team walks through it before you commit to a visit.

DecisionOwn godown or yardShared heavy equipment warehouseProject 3PL
What you commit toA lease, usually multi-yearMonth by month, extendableA contract on volume
Before the first unit landsLand, hardstand, handling, watchmanA handling plan and a positionOnboarding and a rate card
When a site date slipsYou pay, used or notThe term extends with a noteDepends on the contract
Lifting capabilityWhatever you buy or hireHandling planned around the itemPartner's equipment, priced in
Cover and protectionYour own sheeting and upkeepCovered and open positions, cover kept upThe partner's own standard
RecordsYours to design and keepRegister line and release papersHeld in the partner's system
Stops making sense whenThe lease outlives the projectIt is one consignment with no follow-upYou want the register in your own hands
Usually best forA steady multi-year flow of equipmentA package released in phasesA contractor outsourcing the whole store

Most project buyers end up with a mixed arrangement: a monthly position for the live package and a smaller one for spares and warranty items. What matters then is that the register reads the same at both, because two stores holding parts of one machine under two systems is how a commissioning date slips over a missing panel.

Six checks before you book a heavy equipment site

  1. The approach, from gate to position. Walk the route with the vehicle you will actually use: gate width, turning space, apron gradient and door clearances decide more than the rate.
  2. Ground and floor capacity, in writing. Ask for the apron or slab rating and its condition after the last monsoon, and have the answer put in the quote.
  3. Cover and the dimension envelope. Confirm door width, clear height and headroom against your largest unit plus its skid and lifting gear, not a typical one.
  4. How handling is arranged. Who brings the crane, who pads the outriggers, who agrees the lifting points, and how fast a unit can be readied on a release call.
  5. A register you can read. Ask to see one completed line for an item in storage: a position, a piece count and an intake condition on one page means the discipline exists.
  6. The invoice, the term and the notice. GST treatment, the entity on the invoice, the minimum period and the notice for a partial release belong on paper before a trailer is booked.

Red flags to walk away from

  1. A yard with no surface. Bare earth under a loaded trailer in September is a rigging problem waiting for a monsoon.
  2. Positions that fill the apron. A store that parks stock in its only approach has spent your load-out route.
  3. "We can lift anything" with no equipment named. Handling capability is a crane rating and a ground bearing figure, not a reassurance.
  4. Cover that stops at the roof line. If rain drives in at the doors and nothing is done, the shed is a hardstand with a ceiling.
  5. No register, only a gate entry. A diary of arrivals alone cannot say what is inside a crate six months later.
  6. No fallback position. If a consignment cannot move to a second spot when plans change, you are renting ground rather than storing a project.

A worked example: a bulk-handling package waiting on a Greater Noida site

Treat this case as representative rather than a real account. An EPC contractor has taken a bulk-handling package for a plant on the Dadri and Bisnoli industrial belt of Greater Noida, while the fabricator sits in the Faridabad industrial estates off the Mathura Road side. The package cannot share one treatment: two fabricated conveyor frames, a crated drive unit with its panel, idlers on skids and a spares cabinet. The belts are compared in the Gurgaon warehousing guide, the Faridabad guide and the Uttar Pradesh guide, and the industrial estates along them are allotted through the HSIIDC in Haryana.

Three options are on the table: a covered position at Dadri and Bisnoli minutes from the site gate, a unit on the Faridabad belt beside the fabricator, and an open apron on the Manesar side of the Gurugram belt. The apron is the cheapest floor of the three and fails a basic test, because the drive unit, the panel and the idlers are all items weather can spoil.

What decides it is the release pattern rather than the rate. The site is still clearing foundations, each consignment will be called separately, and a release call is followed by a low-bed within a day. Splitting the package across two registers is the one thing the contractor wants to avoid before commissioning, so everything goes to Dadri and Bisnoli: crated unit and panel inside the shed, frames on the paved apron in front of it, one register. That apron drains away from the loading face and the route from the gate crosses no soft ground, so a loaded trailer still reaches the frames in July - something no open yard on the Manesar side could promise, and the corridor between the two belts is walked through in the Haryana corridor guide.

How Lozy handles engineering and heavy equipment storage

Lozy provides engineering and heavy equipment warehousing across 77+ warehouses and more than a million square feet of live space, deepest in Delhi NCR. Items come in against drawings and packing lists, are measured and photographed in position, and are logged on a register line with their spares and manuals.

Because the plan is monthly, the space moves with the project: a package can be extended while foundations clear, released item by item as the site accepts consignments, and handed back when the last crate leaves, on GST-invoiced billing with no lock-in. Larger floorplates sit under industrial warehousing, and a store reconciling piece by piece is what inventory warehousing is built for.

Much of the handling problem is shared with the neighbouring verticals. The manufacturing warehousing guide covers plant-side storage of raw material and output, the auto components guide deals with OEM parts and spares that travel with heavy units, and the electrical and hardware guide covers panels and switchgear that often arrive in the same crate. The industrial warehousing guide and the long-term warehousing guide set out the two bases this trade compares.

To see what is free now, browse the warehouse listing; the services page covers everything from one covered position to a bulk floorplate; and once you have item dimensions, a project reference and a rough date, the contact page replies with rates, cover and availability, usually within the working day.

Lozy shed row in Chennai - metal-clad roof over a run of roller doors with a wide concrete apron in front
The Lozy shed row in Chennai, photographed as it stands today: a long metal-clad roof over a run of roller-shutter doors along the loading face, a finished concrete apron wide enough for a trailer to stand, turn and load, and a boundary wall with a raked gate closing the near end of the yard. For a heavy equipment buyer this is the ground that matters - a paved apron in front of covered bays is what lets a low-bed reach a stored frame in any month, and it is the first thing to look at.

Related guides

Storing machinery, fabricated structures or project cargo?

Send the item dimensions, weights and your site dates - we reply with a handling plan, rates and the space available now.

Get a quoteCall +91 93547 12345

Sources. Every rate, facility name and service basis above is Lozy's own published information. Engineering and capital-goods context comes from IBEF; machinery and plant administration from the Ministry of Heavy Industries; industrial estate development in Haryana from HSIIDC; programme announcements from the Press Information Bureau; highway corridor context from NHAI; GST rules from the GST portal; and warehousing practice from the Warehousing Development and Regulatory Authority.

Reviewed on 14 October 2026. If the FAQ panel below still leaves a question open, call +91 93547 12345 or write to care@lozy.in.

Need warehousing or storage in India?

Request a free, tailored quote in under 2 minutes — free pickup, no lock-in.

Related reading

Frequently Asked Questions

How is a heavy equipment storage bill actually built up?

+

Start with the basis. Industrial space and godown space for rent both start at ₹12 per sq ft per month, on-demand space at ₹14 per sq ft per month and a long-term hold from ₹1,199 per month. Cover, footprint including working space, location, term and handling then move the total, because an item that needs a crane call on every move costs more to keep than one placed once and left alone.

What should I check on the ground before I store a machine outdoors?

+

Check the surface and how it drains, not only the rate. Ask what the apron is rated for and how it stood up in the last monsoon, because a yard that rutted under a loaded vehicle will not take a low-bed in July. Confirm the point load under each skid or outrigger, keep unpainted and electrical items under cover, and walk the load-out route before you sign.

What paperwork should accompany a high-value single item into storage?

+

Arrive with the packing list and drawings, the project reference, and the count of every separate piece travelling with the machine - skids, panels, spares box, manuals. At intake the unit is measured against those papers, photographed in position, and given a register line naming its bay, its pieces and its condition. That record is what a warranty claim or a handover query is settled on.

When in the year is heavy equipment storage hardest, and how is that planned for?

+

Late monsoon is the pinch point. Between June and September site work slows and yards soften, so a release called in July can need handling on ground that has lost its surface. Storage positions are chosen so a truck never has to cross soft ground to reach an item, drain and surface checks are run before the season, and sheds carry the monsoon-sensitive items that should not be waiting on an open apron.

Which storage mistakes cost project buyers the most?

+

The expensive ones are quiet. Placing a unit where no trailer can reach it once the yard softens leads to a second crane call and a re-handling. Storing crated machines and panels in the open turns a weatherproof crate into a refurbishment job. And keeping the register as a gate entry instead of a position, piece count and condition means spares, keys and manuals go missing at commissioning time.

How much notice do you need to release a unit for site dispatch?

+

Give the release list as soon as the site confirms it, and allow a working day for the unit to be readied. Handling, cover removal, bracing refitting, a count against the register line and the gate pass all happen before the trailer is loaded, and where several items leave together in one dispatch slot the sequence is agreed in advance rather than assembled on the day.

Can I store one crate for a few weeks between two trailers?

+

Yes. A single crated item can be held on a short-term or monthly basis while a site, a vendor or a trailer is rearranged, and the same register line carries it through. Billing is monthly with no long lock-in, so a crate that waits three weeks and a package that waits three seasons are both priced on the same published bases rather than on a bespoke arrangement.

Which other businesses store project cargo at Lozy?

+

Mostly project and plant teams: EPC contractors staging several work packages for one site, fabricators holding finished structures until the buyer calls them, OEM project teams with machines delivered early on a purchase order, importers with cleared project cargo waiting on a site date, and maintenance teams holding plant spares and changeover kits between shutdowns. All of them need the same things - measured placement, cover, and a register that matches the project.