Sports Goods Storage Requirements: The 2026 Acceptance Specification
Three things separate a warehouse built for sports goods from a shed that takes cartons: a floor and a bay that take a machine's weight in one place and still let that machine leave without moving anything in front of it, a working area where a unit can be assembled and checked before it is wrapped, and a stock record that names the model rather than the carton count. Sports and fitness products warehousing at Lozy is specified against those three, from ₹21 per sq ft per month in Delhi NCR on a monthly plan. What follows is the specification itself: the minimums for a requirement sheet, the test to run on each during a visit, and the papers that must exist before the first treadmill is unloaded.
- Point load, not average load. A bay is proved by what it carries on one square metre under a plate stack, not by the uniform figure in a lease. Ask for the slab specification in writing, and for a load-spreading plate where the stack is densest.
- A door and a route, both measured. Three metres of clear opening at the shutter and 2.4 m of clear route from bay to vehicle face, with no reverse and no lift, is the minimum for a long machine carton.
- A bench with light and power. Assembly space is a building requirement, not a favour: a bench, floor in front of it, power at the bench, and staging for a whole gym consignment.
- Records at model level. One position per SKU, model or serial captured at intake, a warranty lane separate from saleable stock, and a CSV export you can open without asking anybody.
Most enquiries in this trade are written as an area, a city and a budget, and answered with a rate per square foot. That format works for cartons of one size. It breaks on a catalogue where a machine carton is over two metres long, a plate stack weighs more than the rack beside it, and a boxed accessory the size of a shoebox has to be picked from the same building on the same morning.
So this page is a requirement sheet, not an introduction. It leaves two subjects alone: the trade calendar and the monthly cost are the sports and fitness warehousing guide, and the service itself is sports goods warehousing in Delhi NCR. What is here is the part a landlord and an operator are held to — the building, the bench, the papers and the record.
What a sports goods warehouse must provide that a general godown cannot
Five capabilities decide whether a building can hold this trade, and one that carries four of them fails on the fifth under load: concentrated weight on a small patch of floor, a long carton that must stay horizontal, a bench with services at it, an environment that does not cook rubber, and a record that can tell one model from another. The last two never appear on a rent card, and they are the two that produce the complaints.
Weight in one place, not weight spread evenly
A floor rating is quoted as a uniform load — tonnes over a square metre, averaged across a shed. Nothing here loads a floor evenly. A plate tree, a loaded dumbbell rack, a stack of machine bases or a pallet of kettlebells put a few hundred kilos onto a patch the size of a dining table, through four small feet or one flat base. A slab poured for stacked cartons carries the average and still cracks under the point, so the requirement is stated twice: the uniform rating, and the point-load answer for your densest stack.
A route out, drawn before the goods arrive
The bay is the easy half. The hard half is the walk from bay to vehicle face on the morning a unit sells, and it is settled when the layout is drawn, not when the truck arrives. Two rules cover most of it: no unit stored behind a unit of a different model, and no bay opening onto a route another bay uses as its only exit. What decides it is the clear width at the narrowest point — usually where a column, a fire point or a stack of packaging sits.
A bench, not a corner
Assembled and semi-assembled equipment needs a horizontal surface, light over it, power at it and floor in front of it, all at once. The bench is where a console is fitted, a deck checked for a kink, a bolt set counted and a unit photographed before wrapping. A building that offers space to assemble in, but no bench, no socket and no light, is offering an aisle.
An environment that does not cook rubber or soften a coating
General godown specifications never mention heat, because cartons of hardware do not care. Here the goods do: rubber belts, latex bands, foam mats and flooring tiles age faster in sustained heat and direct sun, and a powder-coated frame stored against a hot roof sheet can arrive at a gym already bloomed. What a warehouse can honestly promise is modest and worth writing down — stock off the roof sheet and away from the sunlit wall, air moving through the shed, goods on pallets rather than on the slab, and a clear answer on monsoon damp at the door line.
A record that names the model
Carton counts are enough for a commodity. Here a treadmill is sold as a model with a console variant and a serial, a bench with or without an attachment, and a warranty unit looks exactly like a saleable one from outside. The record has to hold the model at a position, the serial, the condition at intake, and a flag that keeps a returned unit out of the sellable count.
The acceptance specification: twelve requirements and how to test them
Print it, or keep it open on a phone, and score the building row by row. The figures are drafting minimums to be agreed in writing; they do not replace a structural opinion, a fire certificate or an engineer's report, and those are separate documents listed further down. Any three red rows end the conversation — the purpose of the sheet is to disqualify a site early, not to squeeze a discount out of it.
| Requirement | Minimum | How to test it on the visit | Why it matters for this trade |
|---|---|---|---|
| Point-load capacity in the floor bay | Uniform rating in writing, plus a documented point-load answer for your densest stack and a load-spreading plate where it sits | Ask for the slab specification, then walk the bay looking for cracks radiating from a joint and patch repairs in a line. Put your densest item on one square metre and watch the joint. | Plates, dumbbells and machine bases load a small patch hard. A slab rated for cartons settles and cracks under a plate tree, and a settled slab takes the racking out of plumb with it. |
| Clear height under the lowest obstruction | 6 m from finished floor to the lowest truss, beam or sprinkler head over the racked area; 3.5 m clear over the machine bay | Laser-measure at four corners and the centre, to what is physically in the way rather than the eaves line painted on the wall. Take the lowest reading. | Height is what stores boxed accessories. A machine bay needs the opposite: low, open and clear of anything overhead that a lifted carton can hit. |
| Column span across the bay | 12 m clear between columns in the machine area, no column inside a bay or on its exit route | Pace the grid, mark it on the layout drawing, then lay your longest carton plus turning space against it. Count the bays that survive. | Columns decide how many machines fit and how they come out. A column at the mouth of a bay turns a two-touch move into a four-touch one. |
| Exit route width to the vehicle face | 2.4 m clear for a pallet truck or trolley, with no reverse and no lift on the path | Walk the route with your largest carton and a laden trolley, at the busiest hour the facility will allow. Note every place you stop and turn. | This is the row that saves the most money in the trade. Every machine behind a machine is a double handling on the day it sells. |
| Door opening, ramp and apron | 3 m wide by 3 m high clear opening at the shutter, a ramp or leveller, and a level apron clear of the public road | Measure the opening with the shutter fully up, top and sides. Watch a real vehicle turn and stand, and see whether a long carton passes the door without being turned on a corner. | A machine carton is long and must stay horizontal. A 2.4 m opening forces a tilt, a tilt needs a second pair of hands, and that is where a frame kinks. |
| Racking rating, decking and aisle-end protection | A load rating plate on every beam level, solid decking under boxed kit, uprights protected at the aisle end, no bent beam, no missing pin | Pick three load plates at random and read them, shake a bay by hand, sight along a loaded beam for sag, and look at the guards where the aisle ends. Then ask for the date of the last rack inspection. | Accessories are light but they cube out, so they live in racks. A rack that cannot take a full carton of plates at the bottom level gets overloaded quietly. |
| Assembly and quality-check area | A bench with light over it and power at it, floor in front of the bench, and staging for one complete gym consignment | Ask to be shown where a treadmill would be assembled end to end. Check the socket, the light, the bench height, and whether a truck can reach staging without crossing a pick face. | Semi-assembled units are not dispatch-ready on arrival. Without a bench the fitting happens on the installation morning, in front of the customer. |
| Floor finish, flatness and dust | Sealed, power-floated concrete with filled joints, no lip above 3 mm where slabs meet, and a dry wall base | Drag an empty carton across the floor, wipe two metres with a white cloth, check the wall base for damp staining. Roll a loaded trolley over a joint and feel the step. | Rollers, wheels and deck assemblies are checked by rolling them. A dusty floor puts grit into bearings and into the poly bag a customer opens on camera. |
| Heat, sunlight, damp and pest control | No stock against the roof sheet or a sunlit wall, goods on pallets off the slab, ventilation through the shed, a current pest schedule with bait maps and sighting log | Put a hand on the underside of the roof sheet at midday and on the wall that takes the afternoon sun. Read the pest file for the last three visits; look for gnaw marks on foam. | Rubber, latex and foam age fast in sustained heat, and rodents take foam and grip material first. A hot shed with no pest file is where a band snaps in a customer's hand. |
| Security, CCTV and controlled entry | Coverage of the dock, every bay, the bench and the warranty lane; recording kept at least 30 days; one controlled entry with a visitor log | Ask to view yesterday's footage of the bay you are standing in, from the doorway. Check that the time stamp is genuine and the aisle you are standing in is actually in shot. | A missing machine is a claim, a police complaint and a replacement out of your margin. Footage settles it; a camera pointed at a wall settles nothing. |
| Fire safety and clearance under sprinklers | Current fire certificate or NOC for these premises, two independent exits, serviced extinguishers, stock stacked below the clearance the NOC requires | Read the NOC for the premises address and expiry, not the cover. Open both exits physically. Look at how high existing stock stands relative to the sprinkler line. | Cardboard, foam and rubber burn hot and smoke heavily. Stock stacked into the spray pattern does not get wet where it matters. |
| Model-level stock record with export | One position per SKU, model and serial captured at intake, a movement log with user and time, a separate warranty lane, CSV export on demand | Ask for one model live on screen: position, quantity, last three movements. Ask for the export and open the file yourself. Ask what a returned unit goes through before it can be sold. | Without it you are renting floor. What a warehouse is worth here is the ability to prove a model — to a dealer, a marketplace or an insurer — without picking up the phone. |
If you would rather not score it alone, the sports goods warehousing team will walk a shortlisted site against the twelve rows and name the ones the building fails. Send the twelve rows with your model list and we will mark up which facilities pass them before you spend a day on the road.
Carrying a specification to a site?
Tell us the rows that matter, the largest item you ship and how many models you hold. We will say which facilities pass and what the space costs.
Send the specificationCall +91 93547 12345The envelope: concentrated load, clear span and the route out
The envelope cannot be changed after signing. Racking can be added and a bench moved; a slab, a roof height, a column grid and a shutter opening are the building. Four of the twelve rows are envelope rows, and they are the four to test before anybody discusses rate.
The slab: a uniform figure is the wrong number to accept
Every lease quotes a uniform load, and every machine here concentrates. The honest question is not what the floor takes but what it takes on this square metre, and how the landlord knows. Ask for slab thickness, reinforcement and the base it sits on, then look for evidence the slab has already been loaded: cracks radiating from a joint, a line of patch repairs, a bay cut for a drain and made good. Where the answer is thin, the fix is cheap and belongs in the requirement — a steel plate under the densest stack, and a rule that plates never sit directly on the slab.
Span, and the column that lands in the bay
Machine bays want width and a clean mouth. A 12 m clear span takes a long carton plus the turning space to walk it out; a tighter grid gives short bays with a column at the end of each, and that column is where a two-person lift becomes a three-person one. Mark columns on the layout first and draw the bays second. Then check the doors against the span: a bay behind a doorway narrower than the carton is a display area, not a bay.
The face: opening, ramp and apron
Test the vehicle face with a vehicle. The delivery that matters here is often the largest that will ever call — a container or a long-bed truck for a fit-out — while the dispatch is a tempo. Both have to stand off the public road, on ground level enough that a carton on a trolley does not need lifting at the lip. Three measurements: the clear opening with the shutter raised, the platform height against the bed of the vehicles that actually call, and the turning circle with a vehicle standing in it.
Handling, assembly and the finish that has to survive the journey
Handling is where the difference between a warehouse and a storage room shows. A unit is received slowly and dispatched quickly, and the slow half — open, check, measure, record, and where needed assemble — decides whether the fast half goes right.
Intake: open it, photograph it, measure it
Nothing gets a position until it has been matched to its paperwork — model, quantity, visible condition. For bulky equipment, intake is also when the carton is measured, because the dimension decides the bay: a long carton dropped into a bay built for a squat one shuts the aisle behind it until the season ends. A damage photograph taken before the carton is opened is the only evidence a transporter, an insurer or a supplier will accept later.
Assembly and the quality check
Semi-assembled machines are not dispatch-ready when they are unloaded. The check is short and specific: the frame is square, the finish is unmarked, moving parts run free, the console powers up, the bolt set and manual are in the carton, and the serial on the unit matches the paperwork. Six checks, two minutes, at a bench with light and tools, signed by a named person on a sheet that survives the week.
Powder coating, rubber and latex: what handling and heat do
A powder-coated frame is tough in service and fragile in a warehouse. It chips where an edge drags across a slab, blooms where a carton has stood against a hot roof sheet all summer, and marks where another frame has been stacked on it without a separator. The answers are unglamorous: frames stood upright or laid with a separator, never dragged, corners protected on anything for display.
Rubber and latex have a slower problem, which is time and heat together. A belt, band or mat that sits in a hot shed for a season still looks right and will not perform the same way, and no dispatch check catches it. What a warehouse can do is keep it off the slab, out of the sun, off the roof sheet, and rotate the oldest first so nothing sits through two summers. Anything needing a temperature guarantee needs a different facility, and this network does not offer one — said plainly below rather than buried.
Staging a gym order by installation site
A gym fit-out is not one order; it is a set of orders that must arrive together, at one address, on a date fixed weeks earlier. The requirement is a staging area where a complete consignment can be assembled, checked against the installation list, wrapped, labelled and left standing a few days without disturbing the parcel pick face. Stage by site, not by model. A consignment built in the only free corner of a full shed gets moved twice before it is loaded, and the second move is the one that scratches a console. Chains fitting out several gyms at once are where industrial and bulk warehousing space is the right starting point rather than a racked unit.
Licences and papers: what has to exist before a carton moves
No regulator issues a "sports goods warehouse licence", and anybody who tells you one is required is selling you a registration for a business you are not in. Two sets of paper do the work instead: the ones the building has to be able to produce, and the ones your own entity has to hold. Both get checked before the first pallet lands, because neither is easy to arrange once stock is sitting in the way.
What the premises must be able to show
- Lawful occupancy — a lease, leave-and-licence or title document naming the entity that raises your invoice.
- A fire certificate or NOC that covers these premises, in date, with the address on it matching your agreement. This is the paper everybody produces expired.
- A trade or municipal licence where the local body wants one for storage in that zone, and a straight answer on whether zoning allows warehousing at all.
- A structural note on the slab and on any rack already installed, with the last inspection of that rack.
- Building insurance, and a named answer on cover for your goods — which policy, which peril, what excess.
- Pest control visits and housekeeping records; foam, grip tape and matting are what a rodent takes first.
- The ability to raise a GST tax invoice in the contracting entity's name, rather than a rent receipt from an unregistered proprietorship.
What the seller has to hold
GST comes first, and the step that catches people out is that the warehouse has to be added to the registration as an additional place of business — the address on your certificate will not cover stock sitting somewhere else. The GST portal publishes the procedure, and your accountant can tell you how it lands on your entity's state and constitution. Then:
- Shops and establishment registration under the state Act, where that state asks it of a business trading from the premises.
- Legal metrology registration, as packer, importer or manufacturer, wherever you sell pre-packaged goods with a declared quantity — net quantity, MRP, packer name and consumer care right on the pack and on the listing.
- A BIS registration or quality control order check, category by category. Protective gear, footwear and parts of the equipment range have come under orders at different times, so confirm the current position with the Bureau of Indian Standards instead of assuming an exemption.
- An FSSAI licence if anything on the catalogue is eaten — protein, supplements, bars, drinks. That category needs a food-grade building, and a gym equipment warehouse is not one.
- An IEC from the DGFT if the stock you hold is imported, issued by the DGFT.
- Your own stock policy, because the building's insurance covers the building and its liability, not your inventory.
How to check the set in ten minutes
Take the documents as one bundle and check three fields on each: whose name, which address, what expiry. A certificate issued for a neighbouring shed in the same industrial estate is not a certificate for this building, and a NOC that lists the office block says nothing about the shed behind it. Where the operator works to a professional benchmark, the sector's own reference point is the Warehousing Development and Regulatory Authority. Keep the bundle with the requirement sheet, so a site that has none is struck out on paper instead of debated once your goods are inside. Send the list on WhatsApp and we will mark which items a Lozy facility carries and which remain yours as the seller.
Record-keeping: what has to be written down, and how often
Eight books carry this trade, and every one of them needs a name against it and a rhythm — daily, weekly, monthly. A register kept when there is time is a register that fails in the week it is needed.
| Record | What it must hold | How often | Who signs it off |
|---|---|---|---|
| Inward register | Day, vehicle, vendor, docket or transfer-note number, cartons in and cartons damaged, model and serial per unit, condition at receipt, photographs taken before opening | Every receipt, closed the same day | Receiving supervisor |
| Bay and location register | Each model's position — bay, rack, level, slot — with overflow, staged consignments and temporary spots on the same sheet | At put-away; audited weekly | Stock controller |
| Assembly check sheet | Model, serial, the six checks, parts and manual present, fitter, date, and the consignment the unit went out on | Per assembled or semi-assembled unit | Fitter, countersigned at dispatch |
| Stock-on-hand ledger | Units by model and position: opening, receipts, picks, returns, adjustments, closing | Daily for fast models, weekly for the rest | Stock controller, countersigned monthly |
| Dispatch and installation log | Consignment, lines, installation site, vehicle, driver, e-way bill, handover time, and the receiver's name at the gym | Every consignment | Dispatch supervisor |
| Warranty and return register | Order reference, model, serial, reported fault, photographs, grade, disposition — repair, replace, back to supplier, scrap — and the date of the decision | Per return, decision within an agreed period | Returns desk, reviewed weekly |
| Damage and discrepancy report | What turned up damaged, where it was found, photographs, quantity affected, likely cause and the fix applied | Same day above a set threshold; weekly summary | Facility manager |
| Cycle count and safety file | Models counted, system against physical, variance and the adjustment posted; plus NOC, extinguisher service, rack inspection, pest visits, insurance and training | Count weekly by section, full monthly; certificates quarterly | Stock controller with a second signatory; manager for the file |
These records only become evidence when duties are split: whoever picks should not also close the stock line, whoever assembles should not be the sole signature on the check sheet, and whoever counts should not post the correction. Three numbers are worth tracking monthly: stock accuracy against the count, the share of assembled units that pass first time, and the count of cartons that arrived damaged. Falling accuracy with steady assembly points at receiving; rising assembly failures point at the bench; rising damage points at the door, the ramp or the lift.
What changes the monthly number for a sports catalogue
Six things change the bill, and only one of them is the rate per square foot; the rest are what turn a quotation into a budget.
- The ratio of floor to rack. Machines buy floor and aisle; accessories buy rack height. A catalogue that is 70% boxed kit needs a different building from one that is the other way round.
- Bay geometry. Long cartons need long bays with a clean mouth, which wastes area at the end of every bay. Short cartons need height, which racks give and floor bays do not.
- Assembly minutes. A bench, a fitter and a check sheet are labour and floor, and both are priced. Units needing a console fitted before dispatch cost more than a straight carton pick.
- The length of the season. A four-week surge, a school term and a tournament window are different products from a nine-month hold.
- Channel mix. A dealer-only catalogue moves in pallets and full trucks; adding a D2C store brings picking, packing, labels and a courier handover into the same building.
- Protection materials. Corner boards, separators, stretch wrap and edge protection are consumables. A display-quality catalogue consumes several times the material of a carton-only one.
The published bases are these. Month-by-month floor or racked space begins at ₹21 per sq ft per month, the figure published on the warehouse for rent page — the basis on which a machine bay is priced against a demarked pallet area. Managed space with racking, security and handling included follows the same starting basis on business warehousing. A season's stock starts at ₹1,299 per month on seasonal warehousing, stock held as a running ledger at ₹4,499 per month on inventory and stock storage, and the D2C pick-pack-handover plan at ₹4,999 per month, listed on the e-commerce warehousing service page. Every figure is a starting point rather than a quote — invoiced monthly with GST, no long lock-in, and published together on the pricing page. A racked trading position and a floor bay for machines are priced on different bases, so a straight per-square-foot comparison against commercial warehousing misleads.
Two comparisons are worth running before you negotiate. First, compare bases rather than numbers: ₹21 per sq ft and ₹4,499 a month are not the same animal, and a straight comparison flatters the wrong one. Second, compare months — a rate that looks steep in October is often the cheaper choice in February, because being able to add a bay for six weeks and hand it back is worth something a fixed lease never shows. For one tournament or one school term there is short-term storage and on-demand warehousing; the per-position arithmetic is in the cost per pallet guide.
A worked example: a 900-model catalogue in about 3,500 sq ft
Take a representative case rather than a named customer: a Delhi NCR seller with 900 live models, an average of six units on hand, half the range boxed accessories and half machines, of which roughly one in eight is bulky. That is about 5,400 units. At eight units to a carton the accessory half is some 340 cartons; the bulky eighth of the machine half is about 56 units, each standing on its own footprint.
Racked three levels high, 340 cartons at six to a pallet and three pallets to a level come to about 19 pallet positions — at a 1.2 m footprint and an aisle factor near 1.9, a little under 500 sq ft of racking. The machines dominate: 56 units at an average footprint of two square metres plus walk-out space lands nearer 200 sq m, or about 2,150 sq ft, before the bench and staging. Add a bench with floor in front, staging for one gym consignment and the routes between, and the operation sits in the region of 3,000 to 3,500 sq ft — about ₹73,500 a month at ₹21 per sq ft before handling.
The season, and why it is a cost line rather than a mood
Demand arrives before the buyer does. New-year fitness demand pulls mats, bands, home weights and footwear through the same few weeks; school terms and academies procure in batches before the term starts; tournaments concentrate team kit into a window fixed in advance. Stock sits in the building weeks before the orders and weeks after, so space cost is a curve with a peak in it — a base block for the quiet month plus a seasonal block booked before the peak, as the sports and fitness guide sets out. The layout has to let that block open onto the same route, or the extra space arrives as an obstacle.
Model the month on your model list
Send the number of models, the share that is bulky, the biggest carton in the range and your peak months — we will come back with bays and a monthly figure.
Model my requirementCall +91 93547 12345The five ways sports goods storage fails, and the row that would have caught each
What goes wrong in this trade is rarely dramatic. It is a gap in the specification that only shows under load, and every case below traces back to a row above.
One: the bay becomes the corridor
The layout is drawn with a clean route from every bay to the door, then the season arrives. Overflow is parked temporarily in the route, a staged consignment is built in it, and by the third week the only way to a machine is past two others. The row is exit route width, and the protection is a marked route that no consignment may be staged in, written into the layout rather than agreed verbally.
Two: a uniform floor figure accepted on trust
The lease says the floor takes a load, the number sounds adequate, and nobody asks what happens under a plate tree. Six months later there is a crack running from a joint and a rack that will not sit level. The row is point-load capacity, and the test costs one honest question and one walk around the bay looking for repairs made before you arrived.
Three: the bench that never existed
Assembly was discussed, agreed in principle and never given a surface. The first consignment needs a console fitted, so it is done on the floor beside the bay or at the gym on the morning of the opening. The row is the assembly area, and the test is to ask where a unit would be assembled, then check there is a socket, a light and room to lay a deck flat.
Four: the finish and the rubber, ruined quietly
Frames against a hot roof sheet, mats in the corner that takes the afternoon sun, bands sitting through two summers. Nothing is visibly wrong at dispatch and the failure appears at the customer: a bloomed coating, a band that snaps, a mat that has lost its grip. The rows are heat and sunlight, and floor finish and dust. Neither is expensive to fix at the start and neither can be fixed after the goods are sold.
Five: records at carton level, so the wrong variant ships
The stock report says twelve treadmills. It does not say which console, which deck, or that two of the twelve came back under warranty last month. A dealer orders the variant that is not there, or receives a repaired unit as new, and the argument becomes about trust rather than stock. The row is the model-level record with a separate warranty lane.
All five share a shape: each was cheaper to stop than to repair, and each was visible during the visit to anyone who knew the question. That is the case for walking in with a written sheet rather than an impression, and it is how sports and fitness products warehousing at Lozy is scoped. Where space is shared, the heavy equipment warehousing guide covers the lifting and bay side, and the 3PL warehousing in Delhi NCR guide covers what changes when an operator takes the whole flow.
The handover process, from requirement to first dispatch
Nine steps, in this order, carry a requirement through to a working operation. The two that get dropped when a date is tight — a signed layout and a trial receipt — are the two that avoid the expensive surprises.
- Write the sheet. Twelve rows, model count, how much of the range is bulky, the largest carton, peak months and channels. One page, and the reference every later conversation points back to.
- Ask for the paperwork first. Fire NOC, occupancy, structural note, pest file, insurance and the GST status of the invoicing entity. If a site cannot produce them, skip the drive.
- Shortlist two or three inside one belt, so the decision is about the building rather than the traffic. The Faridabad guide and the Gurgaon guide say what sits where before you give up a day.
- Carry a test kit: laser measure, one carton at each extreme of your range, a loaded trolley, a torch, and the table on paper. Score in front of the person walking you round.
- Sign off the layout: bays by model and batch, rack runs, where the bench sits, staging, the warranty lane, and the route that stays clear whatever the season brings.
- Fix the operating rules — receipt windows, dispatch cut-off, consignment labels, who signs an assembly, what happens to a warranty unit, who is called at night. In the contract, not in a mail thread.
- Then open access: users on the system, the model master with serials, and a dummy consignment received, binned, picked and cancelled before anything real ships.
- Run a trial receipt: one vehicle, one pallet, one machine and one carton of accessories, all the way to dispatch, watched by somebody who will report on it.
- Read three numbers on day seven — stock accuracy on the test models, first-time assembly pass rate, and the time from vehicle arrival to put-away. Good means scale; bad means fix it while it is still small.
The same meeting should settle the exit — notice, how the stock comes back, how long the records survive and in what file — and the weekend logistics. If goods are landing on a Saturday, mail the sheet to care@lozy.in with a photo of the layout, and we will mark it up before the truck is booked.
What to put in the agreement
Ten clauses decide whether a sports goods contract holds up, and most disputes come from a clause nobody wrote rather than from bad faith on either side.
- What you are renting, named. Square feet is not a specification — write down the machine bay, racked area, bench and staging, and what happens when the layout or the season changes.
- The load, as a term. Slab figure plus the point-load answer, with the spreading plate named, so a cracked bay is a contract question and not a debate about trolleys.
- Handling priced item by item — receipt, assembly, staging a consignment, processing a return — and what each of those includes.
- Who carries the loss. Insurance, the excess, whether a claim settles at cost or at retail, and the evidence needed to make one.
- The warranty loop. Who opens a returned unit, who grades it, who decides, the deadline for that decision, and who pays to scrap it.
- Data. Ownership, export format, how often a stock statement is issued, and how long records survive after you leave.
- Your right to walk the floor, count stock and audit, on how much notice, and whether your own fitter may work there during a peak.
- Housekeeping undertakings — roof contact, sunlight, pallet height, pest control, ventilation. Small promises, but the only protection a rubber or latex line has.
- Money and time. Notice period, how an increase is communicated, and whether renewal is monthly or fixed.
- The exit. Days to release stock, the form of the closing statement, and how handling and assembly dues are settled.
Lay the signed draft next to the requirement sheet. Any row that survives only as an email promise is a preference, and a preference is the first thing to vanish when the operator's staff change.
Where Lozy fits, and where we do not
Lozy's network stands at 77+ warehouses and more than a million square feet of live space, run out of Delhi NCR, and a position can be scored against the twelve rows before you commit to it — billed monthly on a GST invoice, with no long lock-in. The published starting points are ₹21 per sq ft per month for floor space and ₹1,299 per month for a seasonal block, and both are checkable against your own arithmetic. Availability sits on the warehouse listing, the belts on the locations page, and the full set on Lozy's services.
We are not the right answer for everything. This network has no cold room, no bonded area and no calibration lab, so anything needing a controlled-temperature guarantee, a bonded hold or a certificate issued on site needs a specialist facility, and we will say that rather than take the booking. Supplement and food lines, hazardous goods and pharma-grade storage sit outside a general warehouse licence. If your need falls on the permitted side of that line, the contact page and the FAQ answer the rest, and the industry pages carry the questions this trade asks most often.

Related guides
- warehousing for sports and fitness brands
- the warehouse inspection checklist
- warehousing in New Delhi
- business warehousing
Score a building before you sign it
Give us your model count, how much of the range is bulky and the city. We will name the facilities that pass the twelve rows and hold them for a visit.
Hold a facility for a visitCall +91 93547 12345Sources. Figures for rates, plans, network size and facilities are Lozy's own published information, read on 25 October 2026. Context on the trade and its exports comes from the Sports Goods Export Promotion Council and IBEF; GST registration and the additional-place-of-business step from the GST portal; product standards from the Bureau of Indian Standards; import paperwork from the DGFT; warehouse practice from the Warehousing Development and Regulatory Authority. The table's minimums are drafting benchmarks for a requirement sheet, and a structural, fire or engineer's certificate is a separate document in every case.
Updated 25 October 2026. If the FAQ below does not cover it, call +91 93547 12345 or write to care@lozy.in.
Need warehousing or storage in India?
Request a free, tailored quote in under 2 minutes — free pickup, no lock-in.